Power curtailment

September 27, 2021
Latest company news about Power curtailment

"Power curtailment" and "stop production" have become the focus of attention of all parties in the market recently. After the completion of the "dual control" target in the first half of the year, various localities have accelerated the pace to promote the "dual control" of energy consumption. Recently, the "dual control" of energy consumption in many places has become stricter, and enterprises in the textile, steel and other industries have restricted production and stopped production. .

 

According to reports, many industrial enterprises in Guangdong Province are required to "start three and stop four" or even "start two and stop five", and "start one and stop six". As of September 23, the maximum load demand in Guangdong Province has been adjusted to 141 million kilowatts, an increase of 11% over the highest load last year, and the load has hit a record high seven times.

 

At present, with the upgrading of dual energy consumption control policies in many places, 16 provinces have introduced power curtailment measures of varying intensity-with less intensity, Sichuan requires "suspending non-essential production, lighting, and office loads"; Greater Ningxia requires "high energy-consuming enterprises to stop production for one month." Major chemical provinces such as Jiangsu, Guangdong, and Zhejiang have even hit harder, taking measures such as "opening two and stopping five" and "limiting 90% of production" against thousands of companies.

 

Our factory has also been affected. But friends, please rest assured that we will do our best to guarantee the production of your casters and guarantee the delivery period to the greatest extent. Friends who need casters, please feel free to contact us.